Landfill & Waste Containment
Base lining, capping and leachate protection
Engineered lining systems keep leachate out of soil and groundwater. We supply smooth and textured HDPE geomembrane, GCL and drainage net for base lining, side slopes and final capping.
Key requirements
- Textured liner on steep side slopes to resist slippage
- GCL as a composite barrier beneath the geomembrane
- Drainage net for leachate collection and gas venting
Project conditions to confirm before purchase
- Waste type and the leachate chemistry the liner will see
- Whether the cell is a base lining, a side slope or a final cap
- Design life and the regulatory lining requirement for the jurisdiction
- Subgrade bearing capacity and expected settlement
- Side-slope geometry and the interface friction the design requires
Typical material build-up
- Prepared and compacted subgrade
- GCL or compacted clay liner as a secondary barrier
- HDPE geomembrane — smooth on the floor, textured on the side slopes
- Nonwoven geotextile protection layer
- Drainage layer or composite drainage net with leachate collection
Typical sequence — the final build-up is confirmed by the project design, not by this page.
What to send for selection and quotation
- Plan and cross-sections, cell dimensions and slope angles
- Design head of leachate and the interface friction requirement
- Membrane grade or thickness if already specified by the designer
- Quantity in m², and the destination port
Construction and testing points
- Trial welds and destructive seam tests per the project specification
- Non-destructive testing of all seams (air / vacuum or spark) as specified
- Protection layer placed promptly; no trafficking on the bare liner
- Construction quality assurance (CQA) by the installer and, where required, an independent inspector
Material basis: HDPE geomembrane to GB/T 17643; short-fibre needle-punched nonwoven protection geotextile to GB/T 17638; GCL and drainage products confirmed against their product data sheets. The final build-up, membrane grade and CQA testing follow the project lining design and CQA plan — no single thickness is set on this page.
Related technical notes
Material selection depends on the loading, the chemistry and the slope. Send the project conditions and we will confirm the membrane grade, protection layer and drainage detail.


